August 14th Update

First, we wanted to mention that the Coffeehouse webcam is up and running again. Thanks to Project Manager Clyde Kestner, the camera is now located just to the west of the porch, and shows the preparation work being done in order to plaster the porch ceiling.

And, as usual, we’re sharing a quick list of some of the work that has recently been completed on the coffeehouse, along with work that will be done in the coming weeks.

Last three weeks of work

  • Installed metal lathe and plaster on ceiling of southwest room and applied whitewash
  • Completed installation of metal lathe in north room, adjacent closets and east stairway
  • Applied scratch coat of plaster in north room, adjacent closets and east stairway
  • Completed installation of west stair
  • Completed installing trim on first floor
  • Continued installing trim on second floor
  • Installed shelves in first floor closets
  • Completed installation of supports for hung ceiling in servery and restroom area
  • Began installing floor tile in restroom and servery
  • Continued making hardware offsite
  • Fabricated window sashes for cellar windows
  • Continued work on corner cupboard offsite
  • Completed installing trim at porch ceiling and began installing wood lathe on ceiling

Next two weeks of scheduled work

  • Continue cleanup inside and provide protection for trim, mantels, etc. as required
  • Complete plastering north center room and closets, and apply whitewash
  • Complete installation of trim and mantels on second floor
  • Obtain inspections of framing and electrical on second floor
  • Complete installation of metal lathe in west stairway
  • Install metal lathe in second floor rooms
  • Begin plastering west stairway and second floor
  • Install window sashes in southeast and southwest rooms
  • Apply primer coat of paint on trim in southeast and southwest rooms
  • Complete installation of wood lathe on porch ceiling
  • Complete installation of coffee bar and close-in of dumbwaiter shaft
  • Complete floor tile in servery and restroom
  • Continue making hardware and complete corner cupboard offsite
  • Willie complete drawings for cellar exhibition kitchen shelving/boxes to conceal ducts
  • Obtain material and begin making posts and rails for east courtyard fence at Great Hopes Plantation

Photos by Peter Inker and Joshua Muse

Comments

(Comment Moderation is enabled. Your comment will not appear until approved.)

Add a Comment

Rick Brouse's Gravatar

Greeting all you way-ward CCH bloggers!
Josh, any opening / dedication dates being tossed around on the horizon that I may need to plan atrip for? ;o)

Posted By Rick Brouse | 8/24/09 12:32 PM
Joshua Muse's Gravatar

Rick,

Good to hear from you. The opening of the Coffeehouse is officially taking place November 20th, and despite a busy schedule, things are things are still looking very good for the deadline.

However I haven't heard any more details on what the events will entail. As soon as I hear something official, I will definitely post it on the blog.

Take care.

Posted By Joshua Muse | 8/24/09 3:53 PM
Robert Kirby's Gravatar

My wife and I have been coming to W'burg every year for over 30 years,somtimes times twice a year.We will be there the ist week in Nov. for our anniversary (31).Will we be able to go into Charltons by then?

Posted By Robert Kirby | 8/27/09 5:30 PM
Joshua Muse's Gravatar

Robert,

Thanks for your message. Charlton's grand opening will take place on November 20th. Before that, we'll be busy with the last minute work on interiors, furnishings, and other post construction details, which means we unfortunately won't be able to open it to the public until the 20th.

My apologies if that's not till after your visit, but Charlton's will definitely be open for your next visit.

Congratulations on your upcoming anniversary.

Take care,
Josh

Posted By Joshua Muse | 8/28/09 11:31 AM